Punesoni ne Maqedonia e Veriut pa themeluar shoqeri
North Macedonia is Merot's home market and the deepest talent pool we hire from. Skopje hosts a concentrated software, BPO, and customer-service workforce; English fluency is high in tech roles, and the EUR-pegged Denar (MKD) keeps cost predictable. Most of our team — and our subsidiary MEROT DOOEL Skopje — is based here.
Ligji i punes — Maqedonia e Veriut
Si funksionon paga
Contractor regime (договор за дело): only PIT applies, no social contributions. Suitable for short-term, project-based work; not for ongoing core roles (misclassification risk under Labor Relations Act, Article 13). Statutory minimum monthly salary as of March 2026: 36,037 MKD gross / 26,046 MKD net (Min. Economy & Labour decree, indexed annually each March).
Pagat mesatare bruto — Maqedonia e Veriut
Shumat mujore bruto ne monedhen lokale. Kosto reale per punedhenesin = bruto + kontributet sociale.
| Pozicioni | Diapazoni (bruto) |
|---|---|
| Software Engineer (mid) | 60,000 – 110,000 MKD |
| Software Engineer (senior) | 110,000 – 180,000 MKD |
| Sales Development Rep (SDR) | 35,000 – 60,000 MKD |
| Account Manager | 45,000 – 90,000 MKD |
| Customer Support Agent (EN) | 36,037 – 55,000 MKD |
| Accountant | 40,000 – 75,000 MKD |
| Graphic / UX Designer | 40,000 – 85,000 MKD |
| Virtual Assistant (EN) | 36,037 – 50,000 MKD |
Shoqeri lokale vs. Merot EOR
| Shoqeri lokale | Merot EOR | |
|---|---|---|
| Koha e konfigurimit | 3–6 muaj | 5 dite pune |
| Avokat lokal | I nevojshem | Jo i nevojshem |
| Kontabilist lokal | I nevojshem (€500–1500/mu) | I perfshire |
| Pajtueshmeria | Juaji | Joni |
| Zyra + pajisje IT | Ti i organizon | I perfshire opsionalisht |
| Mbyllja | 3–6 muaj + tarifa | 30 dite |
Festat shteterore — Maqedonia e Veriut
Pyetjet me te shpeshta — Maqedonia e Veriut
Do I need to set up a Macedonian entity to hire here?
No. Through Merot's local subsidiary (MEROT DOOEL Skopje) we employ your team under a compliant Macedonian contract on your behalf. You retain operational direction; we own the legal employer relationship.
What's the minimum gross salary I can offer?
As of March 2026 the statutory monthly minimum is 36,037 MKD gross (~€586) / 26,046 MKD net. Indexed annually by ministerial decree each March. For competitive engineering or sales roles you'll generally pay several multiples of that — see the salary table above.
How does the gross-to-net math work for an employee?
Macedonia is gross-first. From the gross salary we deduct: 18.8% pension + 7.5% health + 0.5% disability + 1.2% unemployment = 28% of gross. Then PIT at 10% flat on (gross − contributions − 10,932 MKD personal allowance). The remainder is the net the employee receives. Employer cost = the gross figure (no employer-side surcharge).
How long is paid sick leave covered by the employer?
The first 30 days of temporary incapacity are paid at full salary by the employer. From day 31 onwards the Health Insurance Fund (FZO) covers the salary compensation. Employees are required to notify the employer within 24 hours of taking sick leave.
What's the notice period for termination?
Indefinite contracts: 1 month written notice from either side (Merot standard contract Article 25). Probation periods (up to 6 months): 7 days. Termination for cause (gross misconduct, theft, sick-leave abuse, alcohol/drugs at work) is permitted without notice.
Who handles MPIN, PDDGI and other tax filings?
Merot handles all monthly filings to UJP — MPIN for employees, PDDGI for contractors, plus quarterly and annual statements. You receive a monthly invoice with everything itemised; we handle the bureaucracy.
How do I pay a contractor vs. an employee?
Macedonia recognises a contractor regime (договор за дело) where only PIT applies — no social contributions. Suitable for short-term, project-based work. For ongoing core roles the employee structure is the safer (and legally required) choice; misclassification carries fines under Labor Relations Act Article 13.
How long does it take to hire someone in Macedonia through Merot?
Typical end-to-end is 14–28 days from brief to start date. Sourcing + screening: ~3 days for shortlist. Interviews: 1–2 weeks. Offer + contract: 2–3 days. Equipment + first day: 5 days.
Do you supply equipment?
Yes — laptop, monitor, peripherals, software licences. We source locally where possible and ship within 5 business days of contract signature. Hardware is included in the EOR fee or billed at cost; you choose.
What about IP, NDA, and source code?
Standard EOR contracts include IP assignment to the client and NDAs. Both are enforceable under Macedonian law and baked into the employment agreement at hire time so you're protected from day one.
Ku jane verifikuar te dhenat
- Labor Relations Act (Закон за работните односи) — MK Ministry of Labour and Social Policy
- Personal Income Tax Law + Compulsory Social Insurance Law — Public Revenue Office (UJP)
- Health Insurance Fund (FZO) — sick-leave compensation regulations
- Holidays Act of the Republic of North Macedonia — Official Gazette
- Ministry of Economy and Labour — March 2026 minimum-wage decree
- CMS Expert Guide — Labour Law in North Macedonia
- MASIT — Macedonian IT industry workforce statistics
- EF English Proficiency Index 2024
Filloni punesimet ne Maqedonia e Veriut kete jave
Konsultë 30-minutëshe falas.